Hi All,
Right now in our project, we have Development, Quality, Pre-production and Production. Same like that, we have Development, Quality, Pre-production and Production in R/3 side also.
In BW, I ran full load and initialise the delta for standard Data source(2LIS_11_VDITM) in Pre-production of BI side.After doing this, I checked the TCODE RSA7 from the R/3 side Preproduction. While checking the RSA7, the delta queue, we can see data source, Target BW System and number of entries.
In RSA7, the BW Target system should be BW Pre-production, but target system is showing as Production Name instead of Pre-production.
There is no connection between Pre-production R/3 with BW Production.
But in delta queue, the target system is showing as Production system. I have checked the Assignement of source systems in BW Production and found there is no entry related to R/3 Pre-production.
Can you please help on this.
Thanks.