Hi Team,
I have requirement like below. How to configure planning calendar for this requirement?
My requirement is:
The month is split into two periods as below.
Period 1: From 1st day of the month till 20th of the month
Period 2: From 21st of the month till the end of the month.
Whatever the requirements falls within the "period 1", the planning proposals to be generated on 1st day of that month.
Whatever the requirements falls within the "period 2", the planning proposals to be generated on 21st day of that month.
How to set this in ECC in lot size configuration (T.code: OMI4) & planning calendar settings (MD25)?
Can anyone help me understand the below queries with some example?
Your help very much appreciated.
Thanks